Ontify

⌘S

U-560

German Submarine U-560

1941 Type VIIC submarine.

Wikipedia logo

Wikipedia | German Submarine U-560

Statements about U-560

Instance Of

U-Boat

Operator

Kriegsmarine

Manufacturer

Blohm+Voss

Described by Source

The Submarine War, 1939-1945
uboat.net
URL
:bug2: http://wikiba.se/ontology#Url

Commanded By

Hans-Jürgen Zetzsche
(3/6/1941 - 8/24/1941)
Start Time
: 3/6/1941
End Time
: 8/24/1941
Helmut Wicke
(9/1/1943 - 12/12/1943)
Start Time
: 9/1/1943
End Time
: 12/12/1943

Significant Event

Order
(10/16/1939)
Point in Time
: 10/16/1939
Keel Laying
(2/1/1940)
Point in Time
: 2/1/1940
Ship Launching
(1/10/1941)
Point in Time
: 1/10/1941
Ship Commissioning
(3/6/1941)
Point in Time
: 3/6/1941
Scuttling
(5/3/1945)
Location
:
Kiel
Has Immediate Cause
:
Operation Regenbogen
Point in Time
: 5/3/1945
Coordinate Location
: 54.3200°N 10.1500°E

Part Of

24th U-Boat Flotilla
(3/6/1941 - 11/30/1943)
Start Time
: 3/6/1941
End Time
: 11/30/1943
22nd U-Boat Flotilla
(12/1/1943 - 2/28/1945)
Start Time
: 12/1/1943
End Time
: 2/28/1945
31st U-Boat Flotilla
(3/1/1945 - 5/3/1945)
Start Time
: 3/1/1945
End Time
: 5/3/1945

Has Use

Education
(3/6/1941 - 11/30/1943)
Start Time
: 3/6/1941
End Time
: 11/30/1943
Emergency Operations
(12/1/1943 - 5/3/1945)
Start Time
: 12/1/1943
End Time
: 5/3/1945
Powered byWikidataWikidata
Ernst Cordes
(8/25/1941 - 7/15/1942)
Start Time
: 8/25/1941
End Time
: 7/15/1942