Ontify

⌘S

U-399

German Submarine U-399

1943 Type VIIC submarine.

Wikipedia logo

Wikipedia | German Submarine U-399

Statements about U-399

Instance Of

U-Boat

Operator

Kriegsmarine

Manufacturer

Significant Event

Order
(8/25/1941)
Point in Time
: 8/25/1941
Keel Laying
(11/12/1942)
Point in Time
: 11/12/1942
Ship Launching
(12/4/1943)
Point in Time
: 12/4/1943
Ship Commissioning
(1/22/1944)
Point in Time
: 1/22/1944
Sinking
(3/26/1945)
Location
:
English Channel
Has Immediate Cause
:
Depth Charge
Point in Time
: 3/26/1945
Coordinate Location
: 49.9300°N 5.3700°W

Part Of

11th U-Boat Flotilla
(2/1/1945 - 3/26/1945)
Start Time
: 2/1/1945
End Time
: 3/26/1945

Has Use

Education
(1/22/1944 - 1/31/1945)
Start Time
: 1/22/1944
End Time
: 1/31/1945
Emergency Operations
(2/1/1945 - 3/26/1945)
Start Time
: 2/1/1945
End Time
: 3/26/1945

Described by Source

uboat.net
URL
:bug2: http://wikiba.se/ontology#Url
Powered byWikidataWikidata
5th U-Boat Flotilla
(1/22/1944 - 1/31/1945)
Start Time
: 1/22/1944
End Time
: 1/31/1945
Howaldtswerke-Deutsche Werft