Ontify

⌘S

U-276

German Submarine U-276

1942 Type VIIC submarine.

Wikipedia logo

Wikipedia | German Submarine U-276

Statements about U-276

Instance Of

U-Boat

Operator

Kriegsmarine
(12/9/1942 - 9/29/1944)
Start Time
: 12/9/1942
End Time
: 9/29/1944

Manufacturer

Bremer Vulkan

Commanded By

Rolf Borchers
(10/20/1943 - 7/18/1944)
Start Time
: 10/20/1943
End Time
: 7/18/1944
Heinz Zwarg
(7/19/1944 - 9/29/1944)
Start Time
: 7/19/1944
End Time
: 9/29/1944

Significant Event

Order
(4/10/1941)
Point in Time
: 4/10/1941
Keel Laying
(2/24/1942)
Point in Time
: 2/24/1942
Ship Launching
(10/24/1942)
Point in Time
: 10/24/1942
Ship Commissioning
(12/9/1942)
Point in Time
: 12/9/1942
Ship Decommissioning
(9/29/1944)
Location
:
Lübeck
Point in Time
: 9/29/1944
Coordinate Location
: 54.1200°N 10.8300°E
Sinking
(5/3/1945)
Location
:
Lübeck
Has Immediate Cause
:
Airstrike
Point in Time
: 5/3/1945
Coordinate Location
: 54.1200°N 10.8300°E

Part Of

8th U-Boat Flotilla
(12/9/1942 - 2/29/1944)
Start Time
: 12/9/1942
End Time
: 2/29/1944
1st U-Boat Flotilla
(3/1/1944 - )
Start Time
: 3/1/1944
31st U-Boat Flotilla
(7/1/1944 - 9/29/1944)
Start Time
: 7/1/1944
End Time
: 9/29/1944

Has Use

Education
(12/9/1942 - 2/29/1944)
Start Time
: 12/9/1942
End Time
: 2/29/1944
Emergency Operations
(3/1/1944 - 9/29/1944)
Start Time
: 3/1/1944
End Time
: 9/29/1944

Described by Source

uboat.net
URL
:bug2: http://wikiba.se/ontology#Url
Powered byWikidataWikidata