Ontify

⌘S

U-266

German Submarine U-266

1942 Type VIIC submarine.

Image 1
Wikipedia logo

Wikipedia | German Submarine U-266

Statements about U-266

Instance Of

U-Boat

Operator

Kriegsmarine

Manufacturer

Bremer Vulkan

Significant Event

Order
(8/15/1940)
Point in Time
: 8/15/1940
Keel Laying
(8/1/1941)
Point in Time
: 8/1/1941
Ship Launching
(5/11/1942)
Point in Time
: 5/11/1942
Ship Commissioning
(6/24/1942)
Point in Time
: 6/24/1942
Sinking
(5/15/1943)
Location
:
Atlantic Ocean
Has Immediate Cause
:
Depth Charge
Point in Time
: 5/15/1943
Coordinate Location
: 45.2800°N 10.2000°W

Part Of

8th U-Boat Flotilla
(6/24/1942 - 12/31/1942)
Start Time
: 6/24/1942
End Time
: 12/31/1942
7th U-Boat Flotilla
(1/1/1943 - 5/15/1943)
Start Time
: 1/1/1943
End Time
: 5/15/1943

Has Use

Education
(6/24/1942 - 12/31/1942)
Start Time
: 6/24/1942
End Time
: 12/31/1942
Emergency Operations
(1/1/1943 - 5/15/1943)
Start Time
: 1/1/1943
End Time
: 5/15/1943

Commanded By

Hannes Leinemann
(6/24/1942 - 9/11/1942)
Start Time
: 6/24/1942
End Time
: 9/11/1942
Ralf Von Jessen
(9/12/1942 - 5/15/1943)
Start Time
: 9/12/1942
End Time
: 5/15/1943

Described by Source

uboat.net
URL
:bug2: http://wikiba.se/ontology#Url

Image

Image 1
Powered byWikidataWikidata